Previous posts are here. Today's episode highlights the installation of the new electrical service. Each of the twenty-nine apartments will have its own electric meter (tenants will pay for their own electric usage, thank you), plus there will be a house meter (that will cover the power for the elevator, the laundry room, and all of the common area lighting). Going from one meter to thirty is simple, but not easy.
|
The original electric service and panels, soon to be discarded |
|
The blank slate |
|
Building the new meter settings |
|
It is a process |
|
Connecting one meter setting at a time |
|
On the other side of the wall from the meter settings, the
distribution system takes shape |
|
Hopefully it all ends up in the right place |
|
Electrical lines head for the individual units |
|
Except what ends up in the house panel |
|
This finished piece of the inside puzzle represents a lot of work |
|
No longer a blank slate |
There will be several more posts on the work by the electricians.