In converting an old, masonry, three-story, school into an apartment building, one of the first issues to resolve is the plumbing. Each one-bedroom apartment has a shower, toilet, two sinks, and a dishwasher. None of the existing classrooms had those things. Water has to get in and waste water has to get out. The old plumbing was inadequate and in the wrong place. So... in with the new:
Step one: Cutting the concrete floor and digging new trenches for waste lines |
Dug nine trenches for nine new plumbing stacks |
Getting ready to penetrate the outside foundation wall |
Ready to start installing the sanitary lines |
Don't try this at home |
from humble beginnings |
No comments:
Post a Comment