.............of a sub-division: Episode 10
Installing a sanitary sewer manhole:
| Preparing to set the big safety box |
| A bit of hand work with a shovel |
| Getting the elevation right |
| Leveling the gravel base |
| ready to install |
| The structure is easier to position while it is being suspended by the track hoe. Notice the developer's fine footwear |
| Getting properly aligned |
| Connection made with the sewer pipe |
| That should work |
No comments:
Post a Comment