...............................of a sub-division: Episode 8
Installing the sanitary sewer mains.
Sewer pipe has to allow for a down hill flow to work. Better get the grades right the first time |
Sand and gravel soil tends to slide. Have to work in the box for safety's sake |
cutting the sewer main pipe the right length |
If I was a better geologist I might be able to explain the subtle variations of soil levels |
backfill begins. The white poles tell the next crew where to connect the sewer laterals that serve the lots |